
BGen ZERO, power-to-heat TES to replace HFO boilers. The TES is charged from grid electricity at off-peak hours and produces saturated steam and hot water around the clock 24/7/365
12 MWh Thermal Energy Storage
2 MW electrical charging at off-peak hours
5 ton/hr steam output @ 7 bar