Our Projects
TEMPO
PV & Grid Electricity to supply saturated steam to Tempo, a producers and distributors of beverages for brands including Heineken and Pepsi. bGen ZERO will be installed at Tempo’s beverage plant to generate sustainable process steam using off-peak electricity and solar PV, mitigating over 6,200 tons of carbon emissions each year
PPF
Heat-as-a-service to PPF’s manufacturing plant to replace natural gas boilers. Electrical charging at wholesale prices combined with payments from grid operator for grid balancing allows Brenmiller to provide a competitive price for steam on a 12 year contract.
Enel
The TES offers flexible operation of a thermal power plant. Providing energy shifting, storing excess energy during off-peak, and dispatching steam for power generation during peak hours. The TES reduces start-up times and greater speed in load variation
New York Power Authority
Storage based CHP to University campus Decoupling Thermal generation from electric generation allows optimal utilization of fuel and emission reduction
Fortlev
Biomass fueled thermal storage supplies hot air to an industrial plant Increasing fuel efficiency by having a TES buffer and reducing biomass burning to an average instead of peak
Wolfson hospital
BGen ZERO, power-to-heat TES to replace HFO boilers. The TES is charged from grid electricity at off-peak hours and produces saturated steam and hot water around the clock 24/7/365